Corrib Onshore Gas Pipeline - An Bord Pleanála Oral Hearing 2009

Corrib Onshore Pipeline EIS - Addendum Report - May 2009 

The Addendum to the Corrib Onshore Pipeline EIS presented at the Oral Hearing is attached below.

Oral Hearing Briefs Of Evidence

On this page you will find the briefs of evidence read into the oral hearing by the project expert witnesses along with any visual presentations given.

  1. Project Overview
  2. Project Overview_ Visuals
  3. Route Selection Process and Alternatives Considered
  4. Route Selection Process and Alternatives Considered_Visuals
  5. Planning and Development Policy Context
  6. Planning and Development Policy Context_Visuals
  7. Construction
  8. Construction_Visuals
  9. Geotechnical (including peat stability and stone road construction)
  10. Geotechnical (including Peat Stability & Stone Road Construction)_Visuals
  11. Pipeline Integrity and Design
  12. Pipeline Integrity and Design_Visuals
  13. Quantitative Risk Assessment
  14. Quantitative Risk Assessment_Visuals
  15. Landfall Valve Installation
  16. Landfall Valve Installation_Visuals
  17. Noise and Vibration
  18. Noise and Vibration_Visuals
  19. Srahmore Peat Deposition Site
  20. Srahmore Peat Deposition Site-Visuals
  21. Archaeological, Architectural Heritage & Cultural Heritage
  22. Archaeological, Architectural Heritage & Cultural Heritage_Visual
  23. Eco-hydrology/Eco-hydrogeology
  24. Eco-hydrology/Eco-hydrogeology_Visuals
  25. Terrestrial Ecology
  26. Terrestrial Ecology_Visuals
  27. Community And Socio-Economic Issues
  28. Community And Socio-Economic Issues_Visuals
  29. Landscape and Visual
  30. Aquatic and Marine Environment
  31. Aquatic and Marine Environment_Visuals
  32. Cumulative Impact Assessment
  33. Traffic and Roads
  34. Traffic and Roads_Visuals

Additional Information Submitted by the Developer during the Oral Hearing

  1. AGEC Stone Road Stability Report  - Part 1 / Part 2 / Part 3
  2. Clarification of Route Development Process - Cover Note / Final Route Evaluation_Feb 08 / Reduced Route Evaluation Jan 08  /  Evaluation of all Corridors_Sep 07_Sheet 1 / Evaluation of all Corridors_Sep 07_Sheet 2 / Evaluation of all Corridors_Sep 07_Sheet 3 / Evaluation of all Corridors_Sep 07_Sheet 4
  3. Consequence Impact Contour Maps - Cover Note / Fig 1.1 / Fig 1.2 / Fig 1.3 / Fig 1.4 / Fig 1.5 / Fig 1.6 / Fig 2.1 / Fig 2.2 / Fig 2.3 / Fig 2.4 / Fig 3.1 / Fig 3.2 / Fig 3.3 / Fig 3.4 / Fig 4.1 / Fig 4.2 / Fig 4.3 / Fig 4.4 / Fig 5.1 / Fig 5.2 / Fig 5.3 / Fig 5.4 / Fig 6.1 / Fig 6.2 / Fig 6.3 / Fig 6.4 / Fig 7.1 / Fig 7.2 / Fig 7.3 / Fig 7.4
  4. CAO MAP WL(2)027A03
  5. Corrib Onshore Pipeline Response to NPWS Q12
  6. DNV 2004-2009 Risk Data Comparision
  7. Environmental Management Plan
  8. ARUP Report - Review of Glinsk as a Possible Landfall and Terminal Location
  9. JPKenny-Stone Road Settlement Analysis
  10. Maximum length of a single length offshore umbilical
  11. Overview of Works at Terminal Site
  12. Noise & Vibration- Requested Additional Information
  13. Pressure Regime: Subsea to BGE
  14. Proximity of Pipeline Route to Local Housing
  15. Road Construction Details and Site Transportation
  16. Security Activity Profile during Construction and Associated Impacts
  17. Summary of Corrosion Management of Wet Gas Pipelines
  18. Surface Water Management & Monitoring Proposals
  19. Haul Road Pavement Design and Road Cross
    Section-Supplementary Information
  20. DNV - Transect of Ground Movement - Frequency Failure